Labour Cost an overview | ScienceDirect Topics
Labour cost includes an overhead element of £75 per hour. The total cycle time is 100 s. What is the labour cost per part? Labour cost per part is C l = 75 60 × 60 × 100 = £ Figure shows the effect of removal rates using a labour rate with overheads based on £75/h. It can be seen that high removal rates reduce the labour cost per part. Figure Effect of removal